11/0.415KV, 1000kVA Substation; 625KVA & 150KVA Diesel Generator; Full Factory Internal Electrification
/0 Comments/in Uncategorized /by gtengineeringbdProject Name: Factory Malabar Gold and Diamonds Limited
Scope of Work (Supply, Installation of Electrical Part):
- Design Drawing with Construction of Utility Building for Substation & Generator
- Supply, installation, Testing and Commissioning of 11/0.415kV, 1000 kVA Sub-Station equipment
- Supply, installation, Testing and Commissioning of 11/0.415kV, 625 kVA & 150KVA Generator with foreign canopy
- Supply, Installation of all kind of Factory Internal and external Electrification works (Like Cabling and all lighting including decorative light)
- Supply, installation, Testing and Commissioning of Lightening Protection System (LPS)
- Supply, installation, Testing and Commissioning of On-Grid Solar System
- Supply, installation, Testing and Commissioning of On-Line UPS System
Scope of Work (Supply, Installation of Security System Part):
- Supply, installation, Testing and Commissioning of Biometric and Swipe Card Access Control System
- Supply, installation, Testing and Commissioning of Intrusion /Burglar Alarm System
- Supply, installation, Testing and Commissioning of IP CCTV System
- Supply, installation, Testing and Commissioning of PAVA System
- Supply, installation, Testing and Commissioning of Archway Metal detector-Garrett-USA
Location: Madanpur, Narayanganj, Bangladesh
Client: Factory Malabar Gold and Diamonds Limited
We are proud to be successfully complete turnkey project of Electrical & Security System the World class & Exclusive Branded Gold and Diamonds factory
Supply, Installation, Testing and Commissioning of 2nos 10KVA & 30KVA Diesel Generator and UPS Power System
/0 Comments/in Uncategorized /by gtengineeringbdGT Engineering successfully handover Pre-Fabricated Steel Shed including Steel and Civil Part to Largest Cargo Parcel ( REDX Cargo Parcel) at Mather Hub Hazaribagh
/0 Comments/in Uncategorized /by gtengineeringbd

GT Engineering successfully handover to client Pre-Fabricated Steel Shed including Steel and Civil Part
/0 Comments/in Uncategorized /by gtengineeringbd
15000 SFT Pre-Fabricated Steel Shed_Including Civil and Steel Part at Mast Packaging Limited, Sreepur, Savar
/0 Comments/in Uncategorized /by gtengineeringbdProject Name: Mast Packaging Limited
Project Address: Sreepur, Savar
Description: Our New Project is Running_ 15000 SFT Pre-Fabricated Steel Shed_Including Civil and Steel Part at Sreepur, Savar.
Sub-Station & Switchyard Civil Construction
/0 Comments/in Uncategorized /by gtengineeringbdClient Name: Beximco Engineering Ltd.
Project Name: Beximco LPG Plant Limited –Unit-1
Project Address: Mongla, Bagerhat, Bangladesh
Description of Works: `
I) 11/0.415kV HT Swichyard Works including Civil Works
II) 11/0.415kV Sub-Station HT Equipments Supply, Erection, Testing and Commissioning
Total Amount of Works: 1-Crore BDT
Supply , Erection, Testing & Commissioning of 800KVA Sub-Station and HT Switchyard at Beximco LPG Storage & Bottling Facility at Mongla , Bangladesh
/0 Comments/in Uncategorized /by gtengineeringbdClient Name: Beximco Engineering Ltd.
Project Name: Beximco LPG Plant Limited –Unit-1
Project Address: Mongla, Bagerhat, Bangladesh
Description of Works: `
- 11/0.415kV HT Swichyard Works including Civil Works
- 11/0.415kV Sub-Station HT Equipments Supply, Erection, Testing and Commissioning
Total Amount of Works: 1-Crore BDT
Sub-Station & Switchyard Civil Construction
/0 Comments/in Uncategorized /by gtengineeringbdProject Name: CSDP-II
Project Address: Brahmanbaria, Kaaba
Description of Works: 132/33kV Sub-Station Switchyard Civil Works
Job -2 : Supply & Installation testing commissioning of Lightning Protection System (ESEAT)
/0 Comments/in Uncategorized /by gtengineeringbdThe early streamer emission (ESE) concept
During a storm, when propagation field conditions are favorable, an OPR ESE air terminal will generate an upward leader. This upward leader from the OPR tip propagates towards the downward leader from the cloud at an average speed of 1 m/µs.
The emission of an early streamer to a lightning event delivers a beneficial triggering time compared to a single rod air terminal exposed to the same conditions. This in turn drives the enhanced performance and protective distance achievable by ESE devices.
The beneficial triggering time is determined as the average time gained at the moment of sparkover, with efficiency confirmed by high-voltage laboratory testing. All ESE tests are defined in Annex C of the French standard NF C 17-102 (2011 Version).
This beneficial triggering makes OPR air terminals especially effective for the protection of industrial sites, administrative or public buildings, monuments and open-air sites such as sports grounds.